It takes around 9 months for a nail to grow from the root to full length and at about 3 months before the nail becomes visible
The damage in SLO occurs during formation at the root
Nail loosening or shedding happens after the nail becomes visible
After treatment for SLO is started, it will take about 3 months before normal nail starts to appear and as long as 9 months before a relatively normal nail covers the nail bed
A treatment regimen needs to be continued for some months to allow healing and then a very gradual reduction in one component at a time is important to avoid exacerbation of the disease.
Separation with old blood between nail and nail bed
Nail almost off inflammed nail bed
Side view near complete separation
Side view showing separation about half way
Top/side view showing separation about half way
Bottom view showing separation
Healing
Dog 1 - views of loosening nail and nail bed beneath